华为BCC5300D室外电池柜,室外电源柜,5G通信基站电源机柜
华为ICC500-HD2-C5户外综合柜通信电源柜48V开关电源柜
华为户外通信电源柜,双火线,引下线,尺寸770X1250X1825MM,ICC500-HD2-C5市电步骤:
确认ATS的市电交流输入空气开关设置为OFF,并打开ATS前一级的市电AC开关。测量ATS市电交流输入空气开关的输入电压,输入电压应在85V AC和300V AC之间。将ATS市电交流电输入空气开关设置为ON。确认油机停止工作,系统切换到市电
安装指南
华为户外综合通信电源柜
华为ICC500-HD2-C5户外电源柜
主电源接通步骤:
确认ATS的市电交流输入空气开关设置为OFF,并打开ATS前一级的市电AC开关。测量ATS市电交流输入空气开关的输入电压,输入电压应在85V AC和300V AC之间。将ATS市电交流电输入空气开关设置为ON。确认油机停止工作,系统切换到市电电源。
安装指南
华为户外电源柜
华为ICC500-HD2-C5户外通信电源柜,华为机柜,华为,华为户外通信电源机柜,华为通信
ICC500-HD2-C5电缆布局要求:
电缆布局要求:电缆布局必须符合规定的布局要求,以防止信号之间的干扰。说明:如果实际现场不需要安装如下所述的特定电缆,则可以忽略该电缆的布局要求。电缆总布置的弯曲半径要求为:≥电源/保护地线/信号线电缆直径的5倍。电缆绑扎需要将类似的电缆绑扎在一起。不同类型的电缆应至少间隔30mm敷设,禁止相互缠绕或交叉敷设。绑扎后的电缆应相互靠近,外观应平直整齐
安装指南
华为户外电源柜
ICC500-HD2-C5安全注意事项:
安全注意事项一般安全注意事项电气安全蓄电池安全油机安全接线要求机械安全
华为户外电源柜
ICC500-HD2-C5负载通电,油机通电:
给负载通电的步骤是一个接一个地闭合负载空气开关。当每条电路闭合时,应保持钳形电流表以测量母线的电压。当母线电压保持在44.5V DC和57.6V DC之间时,下一个负载空气开关应闭合,直到所有连接的负载空气开关闭合。
通过ECC500进行油机自检,确认自检结果与油机实际数量一致,油机运行正常。ECC500上没有电池报警。







Huawei ICC500-HD2-C5 Outdoor Integrated Cabinet Communication Power Cabinet 48V Switching Power Cabinet
Huawei outdoor communication power cabinet, dual live wire, down lead, size 770X1250X1825MM, ICC500-HD2-C5 mains power on steps:
Confirm that the mains AC input air switch of the ATS is set to OFF, and turn on the mains AC switch of the front level of the ATS. Measure the input voltage of the ATS mains AC input air switch, which should be between 85V AC and 300V AC. Set the ATS mains AC input air switch to ON. Confirm that the oil engine stops working and the system switches to mains power supply
Installation Guide
Huawei Outdoor Integrated Communication Power Cabinet
Huawei ICC500-HD2-C5 outdoor power supply cabinet
Steps for mains power on:
Confirm that the mains AC input air switch of the ATS is set to OFF, and turn on the mains AC switch of the front level of the ATS. Measure the input voltage of the ATS mains AC input air switch, which should be between 85V AC and 300V AC. Set the ATS mains AC input air switch to ON. Confirm that the oil engine stops working and the system switches to mains power supply.
Installation Guide
Huawei Outdoor Power Supply Cabinet
Huawei ICC500-HD2-C5 Outdoor Communication Power Cabinet, Huawei Cabinet, Huawei, Huawei Outdoor Communication Power Cabinet, Huawei Communication
ICC500-HD2-C5 cable layout requirements:
Cable layout requirements: The cable layout must meet the specified layout requirements to prevent interference between signals. Explanation: If the actual site does not require the installation of a certain cable as described below, the layout requirements for that cable can be ignored. The bending radius requirement for general cable layout is: ≥ 5 times the cable diameter for power/protective ground wire/signal wire. Cable binding requires similar cables to be bound together. Different types of cables should be laid at least 30mm apart, and intertwining or cross laying is prohibited. The cables after binding should be close to each other and have a straight and neat appearance
Installation Guide
Huawei Outdoor Power Supply Cabinet
ICC500-HD2-C5 Safety Precautions:
Safety precautions General safety precautions Electrical safety Battery safety Oil engine Safety wiring requirements Mechanical safety
Huawei Outdoor Power Supply Cabinet
ICC500-HD2-C5 load power on and oil engine power on:
The steps for powering on the load are to close the load air switch one by one. When each circuit is closed, the clamp current meter should be maintained to measure the voltage of the busbar. When the busbar voltage is maintained between 44.5V DC and 57.6V DC, the next load air switch should be closed until all connected load air switches are closed.
Perform oil engine self check through ECC500, confirm that the self check results are consistent with the actual number of oil engines and that the oil engine is running normally There is no battery alarm on ECC500.